Standard Installation Process for Rainwater Infiltration Trenches

The construction process for an infiltration trench involves planning, site preparation, trench excavation, base preparation, installation of infiltration cores, and backfilling. Key precautions include strict adherence to engineering standards, protection of utilities, material quality control, and safety measures. Testing ensures system integrity before operation.